The Electric Reliability Council of Texas (ERCOT) is transitioning from a sequential interconnection study process to a centralized Batch Study Process for Large Load Interconnection (LLI) requests. This shift addresses the “restudy loop” inherent in the previous paradigm, where individual studies often became invalid as neighboring loads changed status, leading to constant rework and uncertainty.…